国产99久久久国产精品成人,亚洲中文字幕成人无码,无码国产精品一区二区免费模式,久久久无码精品亚洲日韩按摩

歡迎來(lái)到- 無(wú)錫市長(zhǎng)榮輸送機(jī)械有限公司 的官方網(wǎng)站!
服務(wù)熱線:0510-8338 0342加入收藏聯(lián)系我們
新聞資訊
新聞資訊您當(dāng)前位置:首頁(yè) > 新聞資訊
皮帶輸送機(jī)安全操作規(guī)程
發(fā)布者:admin  點(diǎn)擊:7182

1.移動(dòng)式皮帶運(yùn)輸機(jī)運(yùn)轉(zhuǎn)作業(yè)前,應(yīng)將行走輪用三角木對(duì)稱楔緊。固定式皮帶運(yùn)輸機(jī),應(yīng)安裝在牢固的基礎(chǔ)上。
2.起動(dòng)前,調(diào)整好辦減速這松緊度,帶扣應(yīng)牢固,軸承、齒輪、鏈條等傳動(dòng)部件應(yīng)良好,托輪和防護(hù)裝置應(yīng)齊全,電器接地(接零)保護(hù)良好,輸送帶與滾筒寬度應(yīng)一致。
3.應(yīng)先空載起動(dòng),待運(yùn)轉(zhuǎn)正常后,方可均勻裝料,不得先裝料后起動(dòng)。
4.作業(yè)中,應(yīng)隨時(shí)注意機(jī)械的運(yùn)轉(zhuǎn)情況如發(fā)現(xiàn)輸送帶有松馳或走偏現(xiàn)象,應(yīng)停車進(jìn)行調(diào)整或修理。嚴(yán)禁在運(yùn)轉(zhuǎn)中進(jìn)行修理和調(diào)整。
5.作業(yè)時(shí),嚴(yán)禁任何人員從皮帶運(yùn)輸機(jī)下面穿過(guò)或跨越輸送帶。輸送帶打滑時(shí),不得用手抖動(dòng)拉動(dòng)。
6.輸送大塊物料時(shí),輸送帶兩側(cè)應(yīng)加裝檔板或柵欄等防護(hù)裝置。
7.運(yùn)轉(zhuǎn)中需要停機(jī)時(shí),應(yīng)先停止裝料,待輸送帶上料卸盡后,方可停機(jī)。
8.遇電源突然中斷或其它原因突然停車,應(yīng)立即切斷電源,然后將皮帶上的物料清除掉,等來(lái)電或排除故障后,再接通電源啟動(dòng)運(yùn)轉(zhuǎn)。
9.停車前必須先與有關(guān)方面聯(lián)系,待輸送帶上的物料完全卸掉后,方可停機(jī)。
10.停機(jī)后應(yīng)切斷電源,鎖好電源開(kāi)關(guān)箱,對(duì)機(jī)械各部進(jìn)行保養(yǎng)。用防雨護(hù)罩將電動(dòng)機(jī)蓋好。

中譯英:
1 mobile belt conveyor running before the work, should the walking wheel with wooden triangle symmetric wedge. Fixed belt conveyer, should be installed on a solid basis.
2 before starting, adjustment of the tightness of the easy reduction, buckle should be firm, bearing, gear, chain and other transmission parts should be good, the supporting wheel and the protective device should be complete, electrical grounding ( zero) to protect the good, the belt and the roller width should be consistent.
3 first no-load starting, to be in normal operation, can be uniformly charging, not to charge after starting.
4 work, should always pay attention to mechanical running condition such as found in conveyor with relaxation or off phenomenon, should stop adjustment or repair. Is strictly prohibited in the operation for repair and adjustment.
5 operations, and forbids any personnel from the belt conveyor below through or across the conveyor belt. The conveying belt, not to hand shake pulling.
6 conveyor bulk materials, two sides of the conveyer should install baffles or fence protective device.
7 operation need to stop, should stop charging, stay on the conveyor belt after discharge, before shutdown.
8 in the event of power supply is suddenly broken or other causes of sudden stop, should be immediately cut off the power supply, then the belt material removed, such as call or after troubleshooting, and then turn on the power supply to start running.
9 parking must be concerned with relation to the conveyor belt, the material is fully unloaded, before shutdown.
10 stops should be cut off the power supply, power lock switch box, the Department of mechanical maintenance. Rainproof cover for motor cover.
(圖/文www.changrong-jx.com)

上一頁(yè):皮帶輸送機(jī)安裝前準(zhǔn)備和檢測(cè)調(diào)整
下一頁(yè):HL鏈型斗式提升機(jī)鏈輪的改進(jìn)
關(guān)于長(zhǎng)榮
公司簡(jiǎn)介
資質(zhì)榮譽(yù)
企業(yè)文化
公司客戶
視頻中心
VR全景
企業(yè)新聞
技術(shù)文章
公司新聞
行業(yè)新聞
產(chǎn)品展示
輸送系統(tǒng)
鈦材輸送設(shè)備
螺旋輸送機(jī)
刮板輸送機(jī)
斗式提升機(jī)
振動(dòng)輸送機(jī)和篩分
混合攪拌機(jī)
閥系列
壓包機(jī)
 
破拱機(jī)
松香開(kāi)罐機(jī)
螺旋加濕機(jī)
螺旋擠壓機(jī)
管鏈輸送機(jī)
儲(chǔ)罐
其他非標(biāo)定制設(shè)備
其他
聯(lián)系長(zhǎng)榮
人力資源
客戶反饋
在線留言
聯(lián)系我們

掃描二維碼關(guān)注長(zhǎng)榮